PET bottle filling line installation

We install and commission PET lines from the blow moulder through filler, capper, labeller and conveyors to the packing end.

15+years
350+machines commissioned
100+clients
Water bottles moving along a conveyor on a bottling line
Machine types
Filling line work

PET filling line installation and commissioning

A PET filling line is several machines that must behave as one. The blow moulder makes bottles, air conveyors or unscramblers move them, the filler and capper work at matched speeds, and the labeller and packers follow. If one unit is mispositioned, bottles jam, fall or starve the next machine.

We handle line layout on the floor, positioning of each machine, leveling, conveyor alignment and the connection of power, air, water, CIP and product pipes. After that we commission each unit and then the whole line together, with buffers and sensors tuned so the line runs without constant intervention.

We can also supply contract engineers and technicians for the install phase.

  • Blow moulding machines
  • Filler and capper
  • Labelling machines
  • Conveyor systems
  • Line layout and leveling
  • Whole-line trial
Line sections

Units we install on a PET line

Each unit has its own utilities and checks before the line is linked.

01

Blow moulding

The stretch blow moulder is leveled, with high-pressure air, chilled water for the mould and the preform hopper and heating oven connected. Mould changes and bottle neck handling are tested.

02

Filler and capper

The filler is leveled to its datum, with product, CIP and air lines connected. Cap feeder, chute and capping heads are timed to the bottle flow and torque tested.

03

Labelling

The labeller is aligned to the conveyor height and bottle spacing, with the label reels and glue or sleeve system set for the bottle shape.

04

Conveyors and accumulation

Conveyor sections are aligned in height and straightness, guide rails are set to bottle diameter, and sensors and buffers are tuned for smooth flow.

Planning

Layout, hygiene and utilities for a filling plant

Filling plants have stricter site needs than most machinery. Floors need drainage and a washable finish, and compressed air, water and electrical supply must match the combined demand of every unit. We review these against the layout before machines come off the trucks, and flag gaps early.

A line is only as fast as its slowest unit, so we also check that the speeds of the blow moulder, filler, capper and labeller match, and that conveyor buffers are placed where stoppages occur.

  • Floor drainage and finish checked
  • Compressed air demand for the full line
  • Water and CIP connections located
  • Conveyor buffer positions agreed
Questions

PET Filling Lines FAQ

01Do you install the full line or single machines?

Either. We install a single blow moulder, filler or labeller, or the entire line including conveyors.

02What usually causes bottle jams on a new line?

Common causes are conveyors at slightly different heights, guide rails set too wide, unmatched unit speeds, and sensor delays set incorrectly.

03Can you supply technicians for the install phase?

Yes. We provide contract engineers and technicians for installation and commissioning.

04Do you relocate existing filling lines?

Yes. We dismantle, transport and re-erect them, and can refurbish machines before restart.