Dismantling and marking
We photograph the machine, then disconnect utilities and strip modules in a planned order. Cables, hoses, pipes and mating parts are tagged so each one goes back to its original place.
We dismantle, pack, move and reinstall production machinery, from a single machine to a full line, within a plant, between cities or abroad.

Machine shifting is more than a truck and a crane. A line that runs well in one hall can lose its alignment, lose parts or lose its wiring logic if it is taken apart without a plan. Sahajanand Services manages the whole move, so the machine that leaves the old plant is the one that restarts at the new one.
The work is done by the same teams that erect and commission new lines. They know which joints to mark, which sensors are fragile and which assemblies must travel as one piece.
We have worked on plastic film, packaging and printing machinery for 15+ years and can move equipment inside a factory, across India or to export destinations.
Each stage is planned before work starts, so the order of dismantling matches the order of rebuilding.
We photograph the machine, then disconnect utilities and strip modules in a planned order. Cables, hoses, pipes and mating parts are tagged so each one goes back to its original place.
Precision rolls, drives, instruments and panels are padded and crated. Bare steel is coated against rust. Loose parts travel in labeled boxes tied to the packing list.
We load with cranes and forklifts and coordinate trucks, lowboy trailers and permits for oversize loads. Lashing is planned for each load, and we track the move to the destination.
At the new site we unload, move the machine into place on skates or by crane, then level and align it on the prepared foundation.
Utilities and wiring are reconnected from the tag records, the machine is tested in stages and brought back to running condition.
We review the destination layout, floor loading, door sizes and utility points before the move, so the machine fits where it is going.
The most common cause of delay in a relocation is a destination that is not ready. Foundations need curing time, power and water need to be at the right points, and the access route needs to be measured. We ask for these early and flag gaps while there is still time to fix them.
Decide, too, whether the move is a chance to refurbish. Machines are already stripped down during relocation, which makes inspection of bearings, belts and heaters cheap to add.
We visit or review the layout, record machine condition and write the dismantling and move plan.
Machines are tagged, stripped, protected and crated for transit.
Loads are moved, unloaded and rigged into position at the new site.
Mechanical alignment, wiring and utilities are restored and the machine is run before handover.
Yes. We handle single machines and complete lines, including extruders, winders, printing units and auxiliary equipment. Large lines are broken into planned modules.
Yes. After reinstallation the machine is aligned, tested and run in stages, just as a new machine would be.
We coordinate transport, including trucks and lowboy trailers, and handle loading and unloading with cranes and forklifts.
We can support export moves with dismantling, packing and loading, and with reinstallation at the destination. We work across Asia Pacific, Africa, Europe and the Middle East.
Yes. The machine is already apart, so inspection and overhaul work is practical to add.