Site preparation
Foundations, height and utilities
Blown film towers need clear ceiling height above the die, often several meters beyond the machine floor level, so the building is checked before the crates arrive. Extruder and tower bases are marked from the layout drawing, and anchor positions and any pits are confirmed against the foundation plan. If steel platforms or a tower base need building, we can do that with our construction support.
Utilities are confirmed before erection: three-phase supply sized for heaters and drives, compressed air for the air ring and pneumatics, and chilled water for the gearbox, feed throat and, where used, the air cooling system. Poor water quality or low flow here causes problems that look like machine faults later.
- Ceiling height and crane reach confirmed
- Floor loading checked under extruders and tower
- Chilled water flow and temperature measured
- Earthing resistance tested before power up